Master Production Scheduling (MPS)
Translate demand/forecast into time‑phased build plans with fences.
Build feasible, optimized production schedules: MPS, finite capacity scheduling, constraints & materials sync, sequence/setup optimization, what‑if simulation with drag‑and‑drop Gantt, pegging, dispatch lists, and ATP/CTP — integrated with ERP/MRP, MES/PLC, and WMS.
Translate demand/forecast into time‑phased build plans with fences.
Capacity‑aware sequencing by work center/resource and shifts.
Materials, tooling, labor, and secondary constraints synced to schedule.
Changeover matrices, families/colors, and sequence rules (EDD/SPT/slack).
Drag & drop, split/merge, lock & freeze periods, and batch sizing.
Scenario copies, compare KPIs, and selective publish to operations.
Full pegging from demand to operations; expedite/allocate rules.
Load balancing, alternatives, and overtime calendars.
Release to MES, operator lists, andons/escalations.
Date/time promises based on live capacity and material availability.
Drum‑buffer‑rope, WIP caps, and constraint KPIs.
Adherence, schedule stability, tardiness, and changeover time.
ERP/MRP, MES/PLC/IoT, WMS scanners, and Data Warehouse/BI.
Less waiting and fewer changeovers boost flow.
Commit dates tied to real capacity and materials.
Better synchronization reduces queues and safety stocks.
What‑if scenarios enable quick re‑plans for disruptions.
Alternate routings and calendars level capacity.
Visual boards and KPIs improve decision quality.