Master Production Scheduling
Translate demand and forecast into time phased build plans with fences.
Set planning horizons and manage production schedules.
Finite Capacity Scheduling
Capacity aware sequencing by work center, resource, and shifts.
Balance loads and optimize resource utilization.
Constraints and Synchronization
Materials, tooling, labor, and secondary constraints synced to schedule.
Ensure all resources are available before production.
Sequence and Setup Optimization
Changeover matrices, families and colors, and sequence rules like EDD, SPT, and slack.
Reduce changeovers and improve throughput.
Planning Boards and Gantt
Drag and drop, split and merge, lock and freeze periods, and batch sizing.
Visual boards for easy schedule management.
What if Simulation
Scenario copies, compare KPIs, and selective publish to operations.
Test different scenarios before committing to a schedule.
Pegging and Priorities
Full pegging from demand to operations. Expedite and allocate rules for priority management.
Alternate Routings and Centers
Load balancing, alternatives, and overtime calendars.
Manage multiple routing options and capacity.
Dispatching to Shop Floor
Release to MES, operator lists, andons and escalations.
Send schedules to production teams.
ATP and CTP Promises
Date and time promises based on live capacity and material availability.
Provide accurate delivery dates to customers.
Bottleneck Management
Drum buffer rope, WIP caps, and constraint KPIs.
Identify and manage production bottlenecks.
KPIs and Alerts
Adherence, schedule stability, tardiness, and changeover time.
Track performance and get alerts for issues.